12 weeks ago we were given the task of Removing an existing decommissioned sprinkler system throughout the building, fully design and reinstate over 2500 sprinkler heads to the roof and racking areas.
All new water supplies were installed to FM Global standards, which consisted of a new FM approved diesel engine and 2 x sprinkler tanks both with an effective capacity of 314 m3 each.
Our Fire Alarm division also completely rewired the fire pump room and all new monitoring panels were installed.
We are pleased to announce that we have now completed the installation of the sprinkler system at one of the world’s leading car manufactures new premises.
The tight time schedule gave us no room for error, and we completed all within the desired time set to us by the customer.
We have completed our final commissioning on the sprinkler system and have been checking the monitoring within the pump room. All has gone well and the system is fully LIVE and Operational and is ready to become active in the event of a fire.
The happy customer had some nice words to say about our team.
“It’s been a pleasure working with you, and your team, very professional and responsive Full credit to you for achieving the works in such a short period of time.”
The efforts of all our divisions involved, Sprinkler install, Sprinkler service and Fire alarm install was superb throughout. All of the engineers worked hard to ensure that the project was delivered on time and to a very high standard. Credit to all involved with this project, it’s been a pleasure to work on.
On to the next one!!